The role of contract type in the success of R&D defense projects under increasing uncertainty

This study attempts to reveal the effect of the contract type on the success of defense projects contingent with the level of technological uncertainty existing at the beginning of the project. Based on data collected on 110 defense development projects performed in Israel, it was found that when technological uncertainty at the start of projects is high, cost-plus contracts result in better performance. Fixed-price contracts are better suited for projects with lower levels of technological uncertainty. A combination of cost-plus and fixed-price contracts is suggested for use in projects suffering from high technological uncertainty, starting with a cost-plus contract for the early stages of the project and switching to a fixed-price contract when the uncertainty is reduced.
member content locked

Become a PMI member to gain access

or Join

Advertisement

Advertisement

Related Content

  • PM Network

    Reality Check member content open

    By Bodini, Francesca Massive infrastructure projects frequently gain attention not only for their architectural or technical features but also for their incredible cost overruns. Accurately estimating the costs of…

  • Project Management Journal

    Public-Private Partnerships member content locked

    By Solheim-Kile, Espen | Lædre, Ola | Lohne, Jardar Public-private partnerships (PPPs) have been subjected to considerable public debate. In particular, this debate has concerned PPP financing and its implications. Using insights from agency theory,…

  • Project Management Journal

    Determining Contingencies in the Management of Construction Projects member content locked

    By Ortiz, José I. | Pellicer, Eugenio | Molenaar, Keith R. This research describes the managerial approaches that contractors follow to determine different types of contingencies in construction project management. Two large Spanish general contractors were…

  • PM Network

    The Science of Uncertainty member content open

    By Thomas, Jen Project estimates can sometimes take on a life of their own. The budget for the new international arrivals facility being built at Seattle-Tacoma International Airport in Seattle, Washington, USA…

  • Project Management Journal

    Improving Project Budget Estimation Accuracy and Precision by Analyzing Reserves for Both Identified and Unidentified Risks member content locked

    By Kwon, Hyukchun | Kang, Chang W. Project risk is a critical factor in estimating project budget. Previous studies on this topic have only addressed estimation methods that consider project budget reserves against identified risks.…

Advertisement