Project Management Institute

Re-Creating Organizational Routines to Transition Through the Project Life Cycle

A Case Study of the Reconstruction of London’s Bank Underground Station

This article provides new insights into the project life cycle by proposing an alternative image to the predefined time boundary between life cycle stages.
member content locked

Log in or join PMI to gain access

or Join

Advertisement

Advertisement

Related Content

Advertisement