Contractual Complexity in Construction Projects

Conceptualizations, Operationalization, and Validation

Building on the multifunctional perspective from current contract theory, we conceptualize contractual complexity as a three-dimensional construct to depict the explicitness and elaborateness of control, coordination, and adaptation provisions in a construction project contract. A 13-item scale with construction project features is developed for measuring the different aspects of contractual complexity following rigorous scale development procedures. Using the structural equation modeling technique, empirical testing results demonstrate that all of the three components contribute significantly to contractual complexity. Further analysis indicated that treating contractual complexity in the three-functional way outperforms the unidimensional one regarding power to explain satisfaction and strong-form opportunism.
member content locked

Log in or join PMI to gain access

or Join

Advertisement

Advertisement

Related Content

  • PM Network

    Digital Pulse member content locked

    In the healthcare arena, doctors, patients and project sponsors are all clamoring for more digital therapies and connected devices. That makes this trend a project hot spot this year, according to a…

  • PM Network

    Going with the Wind member content locked

    By Fister Gale, Sarah Offshore wind projects have long been plagued by high technology and connectivity costs, making initiatives all but impossible without government subsidies. "But in the last few years, we've seen a…

  • PM Network

    Artificial Exterminators member content locked

    By Ali, Ambreen Billions of lines of code are written each year, with many applications built on open-source code shared widely among developers. Therein lies a problem: A single error can ripple into thousands of…

  • PM Network

    Clean and Contained member content locked

    By Waity, C. J. During the Vietnam War, the United States sprayed more than 10 million gallons (37.9 million liters) of the toxic herbicide mixture Agent Orange. The tactic used in Vietnam between 1961 and 1971 was…

  • PM Network

    Transformation Tsunami member content locked

    Graphical depiction of global digital transformation projects.

Advertisement

Publishing or acceptance of an advertisement is neither a guarantee nor endorsement of the advertiser's product or service. View advertising policy.